TECHNICAL ASSIGNMENT 2

This report is a production analysis of the foundation and structural systems of the new Ringgold Middle School. The focus of this report is on key features such as field production, planning, and resource use. It includes information such as:

  • Means & Methods

  • Schedule

  • Costs

  • Site Logistics 

To open the full report - click the cover to the left

TECHNICAL ASSIGNMENT 1

This report is an analysis of the conditions under which the building is being constructed and the scope of work. It includes information such as:

  • Project Summary Schedule

  • Building Systems Summary

  • Project Cost Evaluation

  • Site Logistics 

  • Client Information

  • Project Delivery

  • Staffing

To open the full report - click the cover to the left

TECHNICAL ASSIGNMENT 3

This report is an exploration of the challenges and opportunities associated with the project. It analyzes topics such as:

  • Project Management Services

  • PACE Roundtable

  • BIM Evaluation

  • Sustainability implementation

To open the full report - click the cover to the left

Note:  While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Cory Mosco. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

Site Last Updated: 4/26/2017

Cory Mosco

The Pennsylvania State University

Architectural Engineering

Construction Option

(724) 747-9706 | crm5531@psu.edu

bottom of page