SENIOR THESIS FINAL PRESENTATION

This final presentation, given April 6, 2017, is the culmination of the Architectural Engineering Senior Thesis of the new Ringgold Middle School. This presentation investigates the current construction of the new middle school, along with four other in-depth analyses. Additional information can be found in the Final Report.

These additional analyses cover the following topics:

   - Geothermal Implementation

   - Alternate Exterior Wall Systems

   - Energy Monitoring

   - BIM to Facility Management 

To view this presentation, click the cover shown above.

PDF

Powerpoint

Note:  While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Cory Mosco. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

Site Last Updated: 4/26/2017

Cory Mosco

The Pennsylvania State University

Architectural Engineering

Construction Option